Source / pinned edition
Electrical protective equipment
Source of package us.cfr.osha_1910_137 · 29 CFR 1910.137
- work
- urn:us:cfr:osha-1910-137#CFR29_1910_137
- number
- 29 CFR 1910.137
- kind
- urn:us:cfr:osha-1910-137#regulation
29 CFR 1910.137 (eCFR, редакция на 27 августа 2026)
- edition
- urn:us:cfr:osha-1910-137#CFR29_1910_137_2026
- language
- en
- officiality
- official
- materialisation
- PINNED_UNOFFICIAL_COPY
- life cycle
- —
Publications
| URI | Type | documentHash | Retrieved |
|---|---|---|---|
| https://www.ecfr.gov/api/renderer/v1/content/enhanced/2026-08-27/title-29?subtitle=B&chapter=XVII&part=1910§ion=1910.137 | text/html; charset=utf-8 | sha256:2a159ed81f7b4527d0d2be7d6001e090fce5a6c0de7538def425a6271e990ba2 | 2026-09-17T00:00:00Z |
Fragments — 3
section/1910.137/c/2/viii · provision · referenced by: 2
en · official · sha256:7cb4b578cabb3ea03d36c53583a62aadc35e137665367ff02bf3616d5a50097c
<p class="indent-3" data-title="1910.137(c)(2)(viii)"><span class="paragraph-hierarchy"><span class="paren">(</span>viii<span class="paren">)</span></span> Electrical protective equipment shall be subjected to periodic electrical tests. Test voltages and the maximum intervals between tests shall be in accordance with Table I-4 and Table I-5.</p>Referencing norms: NextPeriodicTestDue, PpeTestOverdue
section/1910.137/c/2/xi · provision · referenced by: 1
en · official · sha256:0451b86949c887887fada7412545e91d24bbdf4e34cfd2d07aa54504810bc121
<p class="indent-3" data-title="1910.137(c)(2)(xi)"><span class="paragraph-hierarchy"><span class="paren">(</span>xi<span class="paren">)</span></span> Repaired insulating equipment shall be retested before it may be used by employees.</p>Referencing norms: RetestRequiredAfterRepair
section/1910.137/c/2/xii · provision · referenced by: 2
en · official · sha256:033ce1c2651da94d949d6daa63614b5ab0e5224f7302581d7a1eb3ef16c958ac
<p class="indent-3" data-title="1910.137(c)(2)(xii)"><span class="paragraph-hierarchy"><span class="paren">(</span>xii<span class="paren">)</span></span> The employer shall certify that equipment has been tested in accordance with the requirements of <a href="/on/2026-08-27/title-29/section-1910.137#p-1910.137(c)(2)(iv)" class="cfr external">paragraphs (c)(2)(iv)</a>, <a href="/on/2026-08-27/title-29/section-1910.137#p-1910.137(c)(2)(vii)(D)" class="cfr external">(c)(2)(vii)(D)</a>, <a href="/on/2026-08-27/title-29/section-1910.137#p-1910.137(c)(2)(viii)" class="cfr external">(c)(2)(viii)</a>, <a href="/on/2026-08-27/title-29/section-1910.137#p-1910.137(c)(2)(ix)" class="cfr external">(c)(2)(ix)</a>, and <a href="/on/2026-08-27/title-29/section-1910.137#p-1910.137(c)(2)(xi)" class="cfr external">(c)(2)(xi)</a> of this section. The certification shall identify the equipment that passed the test and the date it was tested and shall be made available upon request to the Assistant Secretary for Occupational Safety and Health and to employees or their authorized representatives.</p>Referencing norms: PpeTestFulfilled, PpeTestOpen
The hash beside the text is the sha256 of its exact bytes. It is the check that the text shown matches the one pinned in the package: a divergence fails the oracle’s static analysis.