Published package / CLIR

kz.corpus.mining_plan_instruction

v0.1.0

Инструкция по составлению плана горных работ

A package can be printed as a standalone module in a general-purpose language that answers without the rules engine: an answer and its status, with no proof, hashes or canonical document. Everything on this page comes from the generation plan built with the index; the gallery computes nothing of its own.

Generation plan

The plan does not build: the package uses forms outside the generation slice.

Checked against package scenarios

Not checked: the package scenarios have not been run against generated modules. A plan that builds does not yet show that the answers coincide.

Why the plan does not build

Every refusal of the plan is listed, not only the first. The texts are generator diagnostics and are shown verbatim.

ReasonOccurrences
тип аргумента вне среза генератора: urn:kz:corpus:clir:mining-plan-instruction#HazardousProductionFacilityRU5
тип аргумента вне среза генератора: urn:kz:corpus:clir:mining-plan-instruction#IndustrialSafetyAuthorityRU2
календарная функция с ошибкой значения над незавершённым входом вне среза генератора (DECISION-0245 п. 7): urn:kz:corpus:clir:mining-plan-instruction#PredelSrokaPlana читает urn:kz:corpus:clir:mining-plan-instruction#mining_plan_approvedRU1